Project for demolition of building partition walls
Executive design of works relating to the demolition of the intermediate walls of the scrap building, with filling with certified soil up to a depth of -2 metres from street level.
The wall crossed by the electrical tunnel coming from the electrical substation will be excluded from the demolition.